The Crosstown Parkway Extension is the culmination of 30-years of planning for Port St. Lucie, Florida. This project will provide a much-needed third bridge crossing the North Fork of the St. Lucie River. The 4000-foot long bridge will traverse a highly environmentally sensitive area requiring minimization of wetland impacts and protection of the Savannas Preserve State Park. It will feature an architecturally unique design and include the first superstreet intersection in Florida involving a restricted crossing U-turn. Discover how design-build principles and practices are being used to manage this exciting project. Learning Objectives: Discover the benefits of the design-build approach for the owner, contractor, and engineer. Enhance the effectiveness of project management through collaboration. Optimize traffic flow using alternative intersection design.

Contributor/Source

James Angstadt;Rachel Back, PE;Frank Knott;Joshua McDermott;Stephen Park

Claim CEUs

Submit this form to claim CEUs.